PPT Slide
Close Range Joint ORD ACTD
14 Feb 95 7 Jun 95 21 Dec 95
- Coverage - 6hrs of flt in 12hr period
- Range - 50km radius of operation (line of
- Launch/Recovery - unprepared, grass or dirt surface
measuring 30m x 75m with a 10m
obstacle clearance at 9,000ft
- Interoperability - with ASAS and AFATDS
- Connectivity - to JSTARS GSM
- Mobility - 2 HMMWVs with shelters
6hrs of flt in 12hr period
50km radius of operation (line of
unprepared, grass or dirt surface
measuring 30m x 75m with a 10m
obstacle clearance at 9,000ft
200km radius of operation (line of
sight) without relay at sea
level (compliant with JII)
unprepared, grass or dirt surface
measuring 30m x 75m with a 10m
obstacle clearance at 6,000ft
- Cost - $350K @ 33rd and $300K @ 100th AV & sensor