LRF/D Production Trade-offs
Decisions for Production
All Payloads with LRF/D vs. Some with LRF/D
Functional Need vs. Cost for Designator
Estimated Cost per System in Production:
FLIR/TV Only w/LRF w/LRF/D
Each $120k $140k $250-300k
(CAIV tgt
@33rd Unit)
Previous slide
Back to first slide
View graphic version