LRF/D Letter Responses
Fort Sill: Designator Desired
- Concurs with 3rd system being integrated with a LRF/D
-
USAARMC Fort Knox: No LRF/D
- “The addition of a LRF/D will only detract from the core mission.”
-
DCD Aviation, Fort Rucker: Growth to LRF/D
- “The TUAV should have at least growth capability” to LRF/D.
-
TSMs (Comanche and Longbow), Fort Rucker:
- Want Growth potential to LRF/D