PPT Slide
225 spots/hr
1200 km2/hr
173 km2/hr
(240/900) spots/hr
400 km2/hr
$350K
$120K
30 min
Area Coverage Rate
- SAR : spot
- MTI
- FLIR: stare (90% Pd/Pr)
spot (0.3m/1.0m)
strip
Payload Cost:
- SAR / MTI
- FLIR
Payload Exchange Time
- Radar/FLIR
N/A
N/A
12 km2/hr
N/A
N/A
N/A
$120K
N/A
100 spots/hr
N/A
86 km2/hr
(120/450) spots/hr
300 km2/hr
$475K
$180K
60 min
Exit Criteria
OPERATIONAL CAPABILITY
BASELINE
ATD MINIMUM
ATD GOALS
Multi-Mission Common Modular
UAV Sensors ATD
Previous slide
Next slide
Back to first slide
View graphic version
Notes:
7