PPT Slide
One Platoon - FWD Site Redundancy
Launch & Recovery Site
Foreword Site
1 AVO/12hrs = 2
1 MC/12hrs = 1
2 EP/12hrs + 1 float = 3
6 FLO/12hrs = 6
PSG = 1
96U = 12
1 TECH/12hrs = 2
1 QC/12hrs = 1
33R = 2
3 MECH/12hrs = 3
52D = 3
PLT LDR = 1
2 X TOC PERS. = 2
1 X FUELER = 1
1 X COOK = 1
OTHER = 5
2 AVO/2 MPO/12hrs = 4
1 MC/12hrs = 1
1 DE/12hrs = 1
96U = 6
2 TECH/12hrs = 1
33R = 2
1 MECH/12hrs = 1
52D = 1
TOTAL PERSONNEL
96U = 18
33R = 4
52D = 4
OTHER = 5
31
1 x UAV TRANS. W/ CRANE
1 x UAV TRANSPORT
FLO VEH
MPU
MPU
MPU
1 x ISU-90
TOC EQUIPMENT
TECH TRLR
* 8 hrs UAV coverage / 12 hrs Opns per 24 hr period (1 AVO at L/R site).
* 12 hrs down time per 24 hr period.
* 1 GCS at launch and recovery site represents UAV safety of flight risk.