FY98 Program Element Descriptive Summaries / RDDS
0604770A Joint Surveillance/Target Attack Radar System
Mission Description and Budget Item Justification: This is a Tactical Intelligence and Related Activities (TIARA) program. US Forces have an urgent need for a wide-area surveillance and target attack radar system capable of continuous coverage out to a depth in excess of 100km beyond their Forward Line of Troops. Commanders must
have the capability to detect, locate, classify and track moving and stationary targets for situation assessment to avoid surprise and attack targets out to the range of existing
and developing weapons. The Joint Surveillance and Target Attack Radar System (JSTARS) provides battle management and targeting of enemy units at critical times and
places so commanders can employ their organic forces and firepower in support of deep, close and rear operations. The joint Army/Air Force program objective is to
develop a radar, datalink, ground station, and airframe that will provide the capability to locate, track and classify tracked and wheeled vehicles beyond ground line-of-sight
during the day, night and under most weather conditions. Radar data is distributed to ground station modules via a secure surveillance and control data link. The Army
developed the ground components of the JSTARS under this PE, project D202. In remaining years, the Army will continue to develop, and validate performance
enhancing Pre-Planned Product Improvements (P3I). Also included in this PE is project D2CT with FY 96 funding for the Multi-Service Operational Test and Evaluation
(MOTE). The projects in this program element support development efforts in the Engineering and Manufacturing Development phases of the Acquisition Strategy and
therefore are correctly placed in Budget Activity 5.
|
COST (In Thousands) |
FY 1996
Actual |
FY 1997
Estimate |
FY 1998
Estimate |
FY 1999
Estimate |
FY 2000
Estimate |
FY 2001
Estimate |
FY 2002
Estimate |
FY 2003
Estimate |
Cost to
Complete |
Total Cost |
D202 |
Army Joint STARS (TIARA) |
13613 |
9624 |
6940 |
5670 |
4121 |
13490 |
19188 |
19205 |
Continuing |
Continuing |
A. Mission Description and Justification: The Army will develop the ground components of the JSTARS under this PE/Project. The Ground Station Module (GSM) is being
developed in a Block approach. Block I Ground Station Modules (GSM) utilize the same prime mission equipment and will be developed and deployed on different platforms.
The Block I Medium GSM (MGSM) is housed in a standard S280 shelter and mounted on a 5 Ton Truck. The rapidly deployable Block I Light GSM (LGSM) is housed in a
Standard Integrated Command Post Shelter (SICPS) and mounted on a High Mobility Multi-Purpose Wheeled Vehicle (HMMWV). A Block I Heavy GSM (HGSM) prototype
was also assembled. This variant integrated the GSM prime mission equipment into a Command and Control Vehicle (C2V) (a Bradley variant). Also included in this project
is the development of the Block II GSM now called the Common Ground Station (CGS). The CGS will integrate signal, imagery, and other intelligence processing into a single
ground station, resulting in enhanced battle management as well as significant cost savings. These enhancements are being implemented in a phased approach of Pre-Planned
Product Improvements (P3I) initiatives and provide significant expansion of the system performance parameters. Significant enhancements include: integration of Secondary
Imagery Dissemination, extended range (SATCOM relay) capability, full on the move and manportable operations as well as integration/interface with other service/allied sensor
systems.
Acquisition Strategy: In December 1995, the JSTARS Ground Station Program awarded an eight year [basic plus seven one year options] production contract to acquire the
balance of ground stations required to meet Army needs. The first two years of the contract are Low Rate Initial Production (LRIP) with the first deliveries participating in a
September 1997 Operational Test. This test will support the Milestone III decision scheduled for May 1998. The contract also includes provisions for the design,
development and test of various P3Is. Following P3I prove out, the modifications are folded into the production contract via fixed price contract revisions.
FY 1996 Accomplishments:
|
1834 |
Completed LGSM EMD Program |
|
10559 |
Initiated Phase I CGS Design/System Enhancements |
|
1220 |
Conducted CGS Phase I Critical Design Review (CDR) |
Total |
13613 |
|
FY 1997 Planned Program:
|
5710 |
Complete Secondary Imagery Dissemination Integration |
|
2106 |
Initiate Sensor Integration (P3I) |
|
1590 |
IOT&E Support |
|
218 |
Small Business Innovation Research/Small Business Technology Transfer (SBIR/STTR) |
Total |
9624 |
|
FY 1998 Planned Program:
|
2904 |
Continue Additional Sensor Integration (P3I) |
|
1771 |
Trainer/Training Enhancements |
|
2265 |
IOT&E Support |
Total |
6940 |
|
FY 1999 Planned Program:
|
2814 |
Complete CGS Expanded Capability Development |
|
2200 |
Provide Additional Simulators/Embedded Training Capability |
|
656 |
Test CGS Expanded Performance Capabilities |
Total |
5670 |
|
B. Project Change Summary |
FY 1996 |
FY 1997 |
FY 1998 |
FY 1999 |
FY 1997 Presidents Budget |
25747 |
9857 |
7202 |
6068 |
Appropriated Value |
26007 |
9624 |
|
|
Adjustments to Appropriated Value |
-12394 |
|
|
|
FY 1998 Pres Bud Request |
13613 |
9624 |
6940 |
5670 |
C. Other Program Funding Summary |
FY 1996 |
FY 1997 |
FY 1998 |
FY 1999 |
FY 2000 |
FY 2001 |
FY 2002 |
FY 2003 |
To
Compl |
Total
Cost |
BA1080 Joint STARS (TIARA) |
82376 |
85321 |
118873 |
89180 |
91196 |
102224 |
36146 |
18039 |
Cont |
Cont |
BS9724 Joint STARS Spares |
3569 |
8770 |
6346 |
6487 |
6600 |
6687 |
7439 |
4747 |
Cont |
Cont |
NATO AGS C35 |
9500 |
0 |
13500 |
15105 |
|
|
|
|
|
|
NATO AGS BA 1082 |
0 |
0 |
26153 |
32575 |
|
|
|
|
|
|
D. Schedule Profile |
FY 1996 |
FY 1997 |
FY 1998 |
FY 1999 |
|
1 |
2 |
3 |
4 |
1 |
2 |
3 |
4 |
1 |
2 |
3 |
4 |
1 |
2 |
3 |
4 |
CGS LRIP Award |
X* |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Conduct CGS PDR |
|
X* |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Complete LGSM EMD Program |
|
|
X* |
|
|
|
|
|
|
|
|
|
|
|
|
|
Conduct CGS Phase I CDR |
|
|
X* |
|
|
|
|
|
|
|
|
|
|
|
|
|
Start CGS Technical Test |
|
|
|
|
X* |
|
|
|
|
|
|
|
|
|
|
|
First CGS LRIP Delivery |
|
|
|
|
|
X |
|
|
|
|
|
|
|
|
|
|
Initial CGS Operator Training |
|
|
|
|
|
|
X |
|
|
|
|
|
|
|
|
|
Conduct Final CGS Technical Test |
|
|
|
|
|
|
|
X |
|
|
|
|
|
|
|
|
Complete CGS Operational Test |
|
|
|
|
|
|
|
X |
|
|
|
|
|
|
|
|
Prepare CGS Operator Test Report |
|
|
|
|
|
|
|
|
|
X |
|
|
|
|
|
|
Milestone III |
|
|
|
|
|
|
|
|
|
X |
|
|
|
|
|
|
Develop Advanced Imagery Capability |
|
|
|
|
|
|
|
|
|
|
|
|
|
X |
|
|
Complete Advanced P3I Technical Test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
X |
|
Complete Advanced P3I Operational
Assessment |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
X |
*Milestone Completed
A. Project Cost Breakdown |
FY 1996 |
FY 1997 |
FY 1998 |
FY 1999 |
Primary Hardware Development |
6059 |
3904 |
1611 |
2064 |
Software Development |
3226 |
2084 |
1852 |
2079 |
Integrated Logistics Support |
265 |
270 |
105 |
95 |
Developmental/Operational Test and Evaluation |
650 |
1590 |
2265 |
525 |
Contractor Engineering Support |
1649 |
801 |
625 |
455 |
Government Engineering Support |
435 |
193 |
144 |
179 |
Program Management Support |
455 |
177 |
170 |
136 |
Program Management Personnel |
874 |
387 |
168 |
137 |
SBIR/STTR |
|
218 |
|
|
Total |
13613 |
9624 |
6940 |
5670 |
B. Budget Acquisition History and Planning Information
Performing Organizations
Contractor or
Government
Performing
Activity |
Contract
Method/Type
or Funding
Vehicle |
Award or
Obligation
Date |
Performing
Activity
EAC |
Project
Office
EAC |
Total
Prior to
FY 1996 |
FY 1996 |
FY 1997 |
FY 1998 |
FY 1999 |
Budget to
Complete |
Total
Program |
Product Development Organizations |
Motorola
(96-C-S201) |
SS/CPFF |
Nov 95 |
10063 |
8339 |
0 |
1750 |
1848 |
1024 |
871 |
2746 |
8339 |
Motorola
(96-C-S204) |
C/FP |
Dec 95 |
34048 |
34048 |
0 |
8117 |
4275 |
2955 |
3616 |
14975 |
34048 |
Cubic
(93-C-0166) |
SS/FPI |
Apr 93 |
6439 |
6439 |
4833 |
946 |
642 |
0 |
0 |
0 |
6439 |
SBIR/STTR |
|
|
|
|
|
|
218 |
|
|
|
|
Support and Management Organizations |
CECOM |
MIPR |
|
|
|
|
435 |
193 |
144 |
179 |
|
951 |
Proj Management |
|
|
|
|
|
1329 |
564 |
338 |
273 |
|
2504 |
Misc. |
MIPR |
|
|
|
|
294 |
144 |
109 |
101 |
|
648 |
Test and Evaluation Organizations |
Various |
MIPR |
|
|
|
|
650 |
1590 |
2265 |
525 |
|
5030 |
Government Furnished Property
Item
Description |
Contract
Method/Type
or Funding
Vehicle |
Award or
Obligation
Date |
Delivery
Date |
Total
Prior to
FY 1996 |
FY 1996 |
FY 1997 |
FY 1998 |
FY 1999 |
Budget to
Complete |
Total
Program |
|
|
|
|
Product Development Property |
Various |
Reqn |
|
|
600 |
92 |
140 |
105 |
105 |
Cont |
Cont |
|
|
|
|
Support and Management Property: N/A |
Test and Evaluation Property: N/A |
Subtotal Product Development |
132137 |
10905 |
7133 |
4084 |
4592 |
Cont |
Cont |
|
|
10203 |
Subtotal Support and Management |
|
2058 |
901 |
591 |
553 |
Cont |
Cont |
|
|
1144 |
Subtotal Test and Evaluation |
|
650 |
1590 |
2265 |
525 |
Cont |
Cont |
|
|
2790 |
Total Project |
132137 |
13613 |
9624 |
6940 |
5670 |
Cont |
Cont |
|
|
12610 |
|
COST (In Thousands) |
FY 1996
Actual |
FY 1997
Estimate |
FY 1998
Estimate |
FY 1999
Estimate |
FY 2000
Estimate |
FY 2001
Estimate |
FY 2002
Estimate |
FY 2003
Estimate |
Cost to
Complete |
Total Cost |
D2CT |
JSTARS Operational Test (TIARA) |
1689 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
5040 |
A. Mission Description and Justification: Project D2CT provides for the Army's costs associated with the Multi-Service Operational Test and Evaluation (MOTE). All
MOTE activities were completed by 2Q96. This Joint Service Initial Operational Test and Evaluation (IOT&E) supports both the US Army and US Air Force for the Joint
STARS Full Scale Production Decisions. (US Air Force in FY 96 and US Army in FY 98)
FY 1996 Accomplishments:
|
789 |
Conducted MOTE |
|
900 |
Completed Test Analysis and Reports |
Total |
1689 |
|
FY 1997 Planned Program: Project not funded in FY 97
FY 1998 Planned Program: Project not funded in FY 98
FY 1999 Planned Program: Project not funded in FY 99
B. Project Change Summary |
FY 1996 |
FY 1997 |
FY 1998 |
FY 1999 |
FY 1997 President's Budget |
1733 |
0 |
0 |
0 |
Appropriated Value |
1750 |
0 |
0 |
0 |
Adjustments to Appropriated Value |
-61 |
0 |
0 |
0 |
FY 1998 Pres Bud Request |
1689 |
|
|
|
C. Other Program Funding Summary |
|
|
|
|
|
|
|
|
To |
Total |
|
|
|
|
|
|
|
|
|
|
|
BA1080 Joint STARS Army TIARA Funding |
80376 |
85428 |
118873 |
90134 |
92274 |
103439 |
36514 |
18154 |
Cont |
Cont |
BS9724 |
3569 |
8770 |
6346 |
6487 |
6600 |
6687 |
7439 |
4747 |
Cont |
Cont |
D. Schedule Profile |
FY 1996 |
FY 1997 |
FY 1998 |
FY 1999 |
|
1 |
2 |
3 |
4 |
1 |
2 |
3 |
4 |
1 |
2 |
3 |
4 |
1 |
2 |
3 |
4 |
MOTE Pre Test Planning and Training |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MOTE |
|
X* |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Prepare MOTE Report |
|
|
X* |
|
|
|
|
|
|
|
|
|
|
|
|
|
*Denotes completed milestone
A. Project Cost Breakdown |
FY 1996 |
FY 1997 |
FY 1998 |
FY 1999 |
Operational Test and Evaluation |
1689 |
0 |
0 |
0 |
Total |
1689 |
0 |
0 |
0 |
B. Budget Acquisition History and Planning Information
Performing Organizations
Contractor or
Government
Performing
Activity |
Contract
Method/Type
or Funding
Vehicle |
Award or
Obligation
Date |
Performing
Activity
EAC |
Project
Office
EAC |
Total
Prior to
FY 1996 |
FY 1996 |
FY 1997 |
FY 1998 |
FY 1999 |
Budget to
Complete |
Total
Program |
Product Development Organizations: N/A |
Support and Management Organizations: N/A |
Test and Evaluation Organizations |
OPTEC |
MIPR |
Dec 94 |
|
|
3307 |
1689 |
0 |
|
|
0 |
4996 |
Government Furnished Property: Not applicable
Subtotal Product Development |
|
|
|
|
|
|
|
Subtotal Support and Management |
|
|
|
|
|
|
|
Subtotal Test and Evaluation |
3307 |
1689 |
|
|
|
|
4996 |
Total Project |
3307 |
1689 |
|
|
|
|
4996 |