FY98 Program Element Descriptive Summaries / RDDS

0604270A Electronic Warfare (EW) Development

COST (In Thousands) FY 1996 Actual FY 1997 Estimate FY 1998 Estimate FY 1999 Estimate FY 2000 Estimate FY 2001 Estimate FY 2002 Estimate FY 2003 Estimate Cost to Complete Total Cost
Total Program Element (PE) Cost 62250 73886 66212 51490 11499 10334 23712 31636 Continuing Continuing
DL12 Signals Warfare Development 13360 16065 13874 7228 5239 5650 15583 17545 Continuing Continuing
DL15 Army Reprogramming and Analysis Team (ARAT) 2830 3764 4024 3323 0 0 0 0 0 17670
DL16 TROJAN Development 517 1261 1278 1333 0 0 0 0 0 4389
DL18 SHORTSTOP Development 6800 9151 0 0 0 0 0 0 0 24475
D665 Aircraft Survivability Equipment Development 38743 43645 46870 37248 6144 4684 8129 14091 Continuing Continuing
D2VT Suite of Integrated Infrared Countermeasures Operational Test (SIIRCM) 0 0 166 2358 116 0 0 0 0 2640

Mission Description and Budget Item Justification: This program element encompasses engineering and manufacturing development for tactical electronic warfare (EW), signals warfare (SW), aircraft survivability equipment (ASE), battlefield deception, rapid software reprogramming and protection of personnel and equipment from hostile artillery. EW encompasses the development of tactical EW equipment and systems mounted in both ground and air vehicles. The systems under this program provide the Army with the capability to degrade or deny hostile forces the effective use of their communications, countermortar/counterbattery radars, surveillance radars, infrared/optical battlefield surveillance systems and electronically fused munitions. Existing Army EW systems must be replaced or upgraded to maintain their capability in the face of threat technical advancements. This program element satisfies requirements for brigade, division, corps and higher commanders to conduct electronic warfare to meet tactical and Special Electronic Mission Aircraft (SEMA) requirements, attach/scout, and assault/cargo mission requirements. Signals Warfare Development provides for development of multifunction ground based and airborne intelligence and electronic warfare systems. The High Value Asset Defense System will provide effective protection of personnel and equipment from electronically fused munitions. TROJAN developments will complete Proof-of-Principle R&D for specific TROJAN applications in advanced threat signals processing and prototype software upgrades; high frequency (HF) algorithms for compact antenna array technology (CAAT) configured into small aperture antenna arrays; search and acquisition capabilities for unattended signal collectors; and new digital intelligence collection, processing and dissemination technology. The ARAT Project will develop, test and equip an Army wide infrastructure capable of rapidly reprogramming electronic combat software embedded in offensive and defensive weapon systems. The projects in this PE are in the engineering and manufacturing development phase of the acquisition cycle and therefore are correctly placed in Budget Activity 5.
COST (In Thousands) FY 1996 Actual FY 1997 Estimate FY 1998 Estimate FY 1999 Estimate FY 2000 Estimate FY 2001 Estimate FY 2002 Estimate FY 2003 Estimate Cost to Complete Total Cost
DL12 Signals Warfare Development 13360 16065 13874 7228 5239 5650 15583 17545 Continuing Continuing

A. Mission Description and Justification: Signals Warfare Development provides for a family of integrated ground-based and heliborne intelligence and electronic warfare common sensor systems. The Ground Base Common Sensor (GBCS) is an intercept and emitter location system. It provides division commanders with the capability to search, intercept, listen to, precisely locate for hard-kill or order-of-battle resolution, or render ineffective through electronic attack, threat command and control and fire control communications nets. It also identifies and precisely locates threat countermortar and counterbattery ground surveillance radar emissions, and identifies enemy conventional and Low Probability of Intercept (LPI) communications and non-communications emitters and jam enemy conventional and LPI communications emitters. GBCS is an evolutionary system which is intended to continually overmatch threat capabilities through a continuous modernization philosophy. Modular components, commercial standards, and open architecture features facilitate change in a cost effective manner of changing parts via P3I vice whole system replacement. This open architecture feature satisfies the Army requirement to conduct tactical ground Communications Intelligence, Electronic Intelligence, Electronic Support, and Electronic Attack against threat communications and non-communications signals; enhances the Commander's ability to outmaneuver and destroy the enemy by locating or jamming threat command and control, fire control, and air defense centers. The GBCS will be used in two platform configurations. The GBCS-Light (GBCS-L) will be deployed on a highly mobile multipurpose wheeled vehicle (HMMWV) in support of Light Divisions. The GBCS-Heavy (GBCS-H) will be deployed on a tracked vehicle in support of Armored and Mechanized Infantry Divisions. The third platform of the Intelligence and Electronic Warfare Common Sensor System is the Advanced QUICKFIX (AQF) which provides for a material change to the existing heliborne QUICKFIX communications intercept, collection, processing, direction finding, and jamming system and will be deployed to Army Divisions and Armored Cavalry Regiments (ACR). Configured in a Blackhawk Helicopter (EH-60A), it provides the moving platform necessary to provide for location accuracies sufficient for "steel on target" requirements, as well as for extension of radio Line of Sight (LOS) against target emitters. This project provides for engineering and manufacturing development (EMD) and testing of Intelligence and Electronic Warfare Common Sensor (IEWCS) Subsystems and Systems leading to Milestone III and product improvement of systems after initial production. The Subsystems are:

a. The Tactical and Communication Jammer (TACJAM-A) will enhance the Division Commander's ability to outmaneuver and kill the enemy by isolating and suppressing enemy fire control and command and control (C2) nets at critical points in the battle; provide electromagnetic overwatch of the threat C2 spectrum inclusive of both conventional and modern modulations (LPI); freeze the enemy in place by jamming C2; and eliminate enemy counterfire by locating High Value Targets (HVTs) for targeting. TACJAM-A consists of state-of-the-art modular and scaleable Electronic Support Measures (ESM) and Electronic Countermeasures (ECM) subsystems configured for use on a variety of air and ground prime movers (tracked, wheeled and heliborne).

b. The Communication High Accuracy Location System (CHALS-X) provides the targeting capability required to support the Division Commander's requirement to locate and kill the enemy by providing location of high value targets. Airborne systems mixed with ground based systems will be capable of precisely locating enemy weapon systems and units (regardless of whether the enemy uses conventional or modern radios) producing target locations sufficiently accurate for first round fire for effect by organic artillery.

c. The Common Modules ELINT Subsystem (CMES) provides search, intercept, direction finding (DF), precision location and analysis of the primary non-communication (radar) battlefield threat emitters. While operating in a fully automatic mode, it will enhance the Division Commander's ability to outmaneuver and kill the enemy by specifically identifying HVTs such as enemy countermortar, and counterbattery ground surveillance radar at critical points in the battle and will provide precise emitter locations with targeting accuracy.

The United States Marine Corps is utilizing the same subsystems as the GBCS and configuring them in a Light Armored Vehicle as a part of the Mobile Electronic Warfare Support System (MEWSS) improvement program.

This unclassified project is joint with the National Security Agency's Defense Cryptologic Program (DCP), Program Element 030885G, which provides a portion of the funds required for the development of the precision location subsystem and system integration of GBCS-L and GBCS-H.

Acquisition Strategy: GBCS provides the commanders of Divisions, Brigades and ACR with an organic capability to listen to, precisely locate for hard-kill or order-of-battle resolution, or render ineffective through electronic attack, threat command and control and fire control communications nets, and identify and precisely locate threat countermortar and counterbattery ground surveillance radar emissions, and other communications nets. The system is specifically designed to ensure transportability, prime mover maintainability, and over terrain mobility equal to that of the supported divisions, regiments, and brigades while exploiting or eliminating - at the commander's discretion - the latest, most modern type of hostile modulations and transmissions techniques at the key time and place on the battlefield. GBCS is an evolutionary system which is intended to continually overmatch threat capabilities through a continuous modernization philosophy. Modular components, commercial standards, and open architecture features facilitate change in a cost effective manner by enhancing software or changing parts via P3I vice whole system replacement. This open architecture feature satisfies the Army requirement to conduct tactical ground communications intelligence, electronic intelligence, electronic support, and electronic attack against threat communications and non-communications signals; enhances the commander's ability to outmaneuver and destroy the enemy by locating or jamming threat command and control, fire control, and air defenses centers.

FY 1996 Accomplishments:
241 Completed TACJAM-A ESM Development
7401 Continued (GBCS/AQF) Integration effort

- Fielded EMD Models of GBCS and AQF Systems to Task Force XXI

- Improved GBCS/AQF by including other advanced communication modifications/techniques as well as advanced signal analysis and improved

signal sorting parameters

- Began integration of TACJAM-A ECM into AQF

1749 Conducted operation demonstration customer test/development test (OCDT) on GBCS
3044 High level software design and initiated hardware development
925 Provided contractor maintenance support for Task Force XXI
Total 13360

FY 1997 Planned Program:
87 Conduct special in-process review (SIPR) on AQF ECM
4622 Continue GBCS/AQF improvements to include advanced digital modulations and techniques, remote collection techniques, finish ECM subsystem integration into AQF and begin integration into GBCS-L and GBCS-H, other product improvements resulting from Task Force XXI
6900 GBCS-L/AQF software fixes
1106 Conduct training and provide contractor depot repair in support of IOT&E for GBCS-L
1072 Contractor maintenance support for Task Force XXI
1900 ADEXJAM incremental
378 Small Business Innovation Research/Small Business Technology Transfer (SBIR/STTR)
Total 16065

FY 1998 Planned Program:
2996 Begin integration of ECM subsystem into GBCS-L and GBCS-H
1367 Complete signal analyzer upgrade and provide for production line cutover
4289 Start GBCS/AQF pre-planned product improvement (P3I); continued advanced digital modulations, reconfigurable tuner, co-channel analysis, analog-to-digital converter, improved signal analysis, enhanced sorting parameters capability and improve HF tuners
2945 OCDT for GBCS-H and AQF
1629 Conduct training and provide contractor depot repair in support of IOT&E for GBCS-H and AQF
318 Conduct Milestone III for GBCS-H and AQF
186 Complete IOTE on GBCS-L
144 Conduct Milestone III for GBCS-L
Total 13874

FY 1999 Planned Program:
6694 Continue GBCS/AQF P3I
245 Conduct testing on previously implemented improvements
289 Complete GBCS/AQF development of advanced capabilities and remote collection
Total 7228
B. Project Change Summary FY 1996 FY 1997 FY 1998 FY 1999
FY 1997 President's Budget Request 13692 16414 16223 9884
Appropriated Value 13831 16065
Adjustments to Appropriated Value -471
FY 1998 Pres Bud Request: 13360 16065 13874 7228

Change Summary Explanation:

Funding: FY 1998/FY 1999: Funding reductions from President's Budget are the result of Army Science Board report (Reengineering the Institutional Army, the

Acquisition Perspective) recommended reductions (FY 98 -2349/FY 99 -2656)

Schedule: IOT&E for GBCS-L rescheduled from 4QFY96 to 4QFY97 due to integration problems. IOT&E for AQF rescheduled from 4QFY97 to 3QFY98 due to

subsystem availability.
C. Other Program Funding Summary FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 To

Compl

Total

Cost

OPA (SSN BZ7326) 45470 47033 26817 37269 88615 90635 93674 107640 Cont'd Cont'd
OPA (SSN BZ9753) 0 0 0 0 6179 12561 13083 21987 Cont'd Cont'd
APA (SSN AB3000) 37142 13899 38140 37301 55833 68509 78011 86141 Cont'd Cont'd
RDTE Budget Activity 7

DCP PE 030885G, GBCS

18949 19824 19324 19624 19724 20893 20924 21260 Cont'd Cont'd
RDTE Budget Activity 7

DCP PE 030885G, CHALS-X

3038 2998 4165 5515 6046 6828 4201 4285 Cont'd Cont'd
D. Schedule Profile FY 1996 FY 1997 FY 1998 FY 1999
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
Acquisition Milestones
Award Limited Production Contract X*
Milestone III on GBCS-L X
Milestone III on AQF X
Milestone III on GBCS-H X
Complete Development of Advanced

Capabilities

X
T&E Milestones
Begin IOTE on GBCS-L X
Complete IOTE on GBCS-L X
Conduct IOTE on AQF X
Conduct IOTE on GBCS-H X
Contract Milestones
Field RDT&E Model of GBCS-L X*
SIPR - AQF ECM X
Task Force XXI X* X* X* X X

*Denotes completed milestone
A. Project Cost Breakdown FY 1996 FY 1997 FY 1998 FY 1999
Primary Hardware Development 3504 2627 3750 2983
Software Development 3216 6641 4283 2216
Systems Engineering 421 1739 703 365
Integrated Logistics Support 841 1032 894 465
Quality Assurance; Reliability; Maintainability & Availability 672 825 715 371
Developmental Test & Evaluation 784 962 2824 433
Government Engineering Support 1658 713 355 199
Program Management Support 606 326 98 55
Program Management Personnel 1658 822 252 141
SBIR/STTR 378
Total 13360 16065 13874 7228

B. Budget Acquisition History and Planning Information

Performing Organizations
Contractor or Government Performing Activity Contract Method/Type or Funding Vehicle Award or Obligation Date Performing Activity EAC ** Project Office

EAC **

Total Prior to

FY 1996

FY 1996 FY 1997 FY 1998 FY 1999 Budget to Complete *Total Program
Product Development Organizations
Sanders/AEL C-CPIF Jun 89 216686 216334 205051 5880 1900 985 0 0 213816
IBM/Loral SS-CPFF Jun 90 52997 52997 47623 300 0 0 0 0 47923
ESI C-CPAF Sep 91 189463 186424 103764 685 1000 0 0 0 105449
FMC SS-CPFF Sep 90 15913 15913 12377 1436 1900 700 500 0 16913
LMFS-O (GBCS/AQF) C-FFP Nov 95 94577 94577 0 887 6337 8974 6323 Cont'd Cont'd
Loral-AD/EXJAM SS-CPIF Mar 96 0 0 1900 0 0 0 1900
Misc. 2638 250 0 10 3 Cont'd Cont'd
SBIR/STTR 0 0 378 0 0 0 378
Support and Management Organizations
QuesTech FFP May 95 630 625 80 15 Cont'd Cont'd
In-House Direct 5566 1724 1515 625 380 Cont'd Cont'd
CECOM

Ft Monmouth NJ

MIPR 4904 1026 0 0 0 Cont'd Cont'd
Test and Evaluation Organizations
EPG/Ft. Hood MIPR 2035 542 510 2500 7 Cont'd Cont'd

Government Furnished Property
Item Description Contract Method/Type or Funding Vehicle Award or Obligation Date Delivery

Date

Total Prior to FY 1996 FY 1996 FY 1997 FY 1998 FY 1999 Budget to Complete Total Program
Product Development Property
NOTE: TACJAM-A/CHALS-X/EFVS, Sanders-AEL/IBM-Loral/FMC, respectively, identified above as Product Development Organizations
Support and Management Property: N/A
Test and Evaluation Property: N/A
Subtotal Product Development 371453 9438 13415 10669 6826 411801
Subtotal Support and Management 10470 3380 2140 705 395 17090
Subtotal Test and Evaluation 2035 542 510 2500 7 5594
Total Project 383958 13360 16065 13874 7228 434485

*Total Program does not includes funding from other sources.

**Project Office EAC includes Marine Corps and National Security Agency funds which are not included in the Total Program (Army budget).
COST (In Thousands) FY 1996 Actual FY 1997 Estimate FY 1998 Estimate FY 1999 Estimate FY 2000 Estimate FY 2001 Estimate FY 2002 Estimate FY 2003 Estimate Cost to Complete Total Cost
DL15 Army Reprogramming and Analysis Team (ARAT) 2830 3764 4024 3323 0 0 0 0 0 17670

A. Mission Description and Justification: Army Reprogramming and Analysis Team (ARAT) for Target Sensing Systems (TSS) project will design, develop, implement, test, equip and institutionalize an Army-wide infrastructure capable of rapidly reprogramming electronic combat software embedded in offensive and defensive weapon systems. ATSS are those tactical weapons and sensor systems which rely on embedded, well-defined target or emitter signature data for specific identification. Systems supported by this project include but are not limited to: radar warning receiver and jammer sub-systems of attack, scout, utility and SEMA aircraft; aircraft survivability equipment; automated intelligence collection systems and jammers; advanced threat sensors for air defense, artillery and missile applications, and use as vehicle /troop self-protection systems. The project focuses on advanced information management technologies to: automate the threat recognition process; evaluate the operational impact of threat changes on inventoried sensor; develop, test and evaluate software to counter the change; develop tactical loading devices for deploying or deployed forces; and institutionalize the infrastructure to accomplish these tasks as well as distribute/disseminate the new software.

Acquisition Strategy: The ARAT to TSS project will design, develop, implement, test, equip and institutionalize all Army-wide infrastructure capable of reprogramming electronic combat software embedded in offensive and defensive weapons systems. The program requirements for software engineering, development, support equipment engineering acquisition, operational training and test and evaluations support will be acquired by the use of time and material contracts. This strategy will further such major program events such as the test and evaluation of off-the-shelf and developmental loading devices, the completion of connectivity of a secure Wide Area Network with all reprogramming centers and the development of flagging models for specific electronic combat survivability systems.

FY 1996 Accomplishments:
1083 Tested and evaluated off-the-shelf and developmental memory loading devices for aviation electronic combat (AEC) equipment
425 Modified or developed database management tools for AEC equipment
500 Evaluated hardware/software and developed measurement and signature intelligence (MASINT) on-line database access capability
375 Upgraded ARAT communications systems
447 Expanded on the application of Electronic Intelligence (ELINT) flagging models for additional Mission Data Sets
Total 2830

FY 1997 Planned Program:
1517 Modify or develop database management tools for ADA, IEW, Fire Support and Armor TSS
1120 Test and evaluate off-the-shelf and developmental loading devices for ADA, IEW, Fire Support and Armor TSS
375 Initiate study on the feasibility of electronic broadcast reprogramming
FY 1997 Planned Program: (continued)
380 Improve or modify ARAT flagging capability for ELINT systems
280 Enhance MASINT database on-line capability
92 Small Business Innovation Research/Small Business Technology Transfer (SBIR/STTR)
Total 3764

FY 1998 Planned Program:
975 Initiate integration of Electro-optic/Infrared (EO/IR) based systems into reprogramming infrastructure
427 Develop and design communications architecture paths to support CONUS and OCONUS field unit communications
1583 Begin to implement support plans for PM, Aviation Electronic Combat (SIRFC to AMPS interface)
702 Begin development of specific flagging models for AN/APR-39A(V)2 Radar Warning Receiver
337 Development of Multi-Service Electronic Combat Secure Web Site.
Total 4024


FY 1999 Planned Program:
828 Finalize implementation of support plans for PM, Aviation Electronic Combat (SIRFC to AMPS interface)
749 Test and evaluate the communications architecture paths to support CONUS to OCONUS field unit communications
379 Finalize Flagging Model for the AN/APR-39A(V)2 Radar Warning Receiver
883 Begin Flagging Model for the Suite of Integrated RF Countermeasures (SIRFC)
484 Develop training materials for commanders staff & unit level personnel (Warfighters Handbook)
Total 3323
B. Project Change Summary FY 1996 FY 1997 FY 1998 FY 1999
FY 1997 President's Budget 2903 3845 4331 3596
Appropriated Value 2933 3764
Adjustments to Appropriated Value -103
FY 1998 Pres Bud Request 2830 3764 4024 3323

C. Other Program Funding Summary: Not applicable.
D. Schedule Profile FY 1996 FY 1997 FY 1998 FY 1999
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
Test and evaluate off-the-shelf and

developmental loading devices for

aviation combat equipment.

X*
Modify or develop database management

tools for aviation combat equipment.

X*
Initiate study on the feasibility of

electronic broadcast reprogramming.

X
Modify or develop database management tools for ADA, IEW, Fire Support and Armor TSS X X
Test and evaluate off-the-shelf and developmental loading devices for ADA, IEW, Fire Support and Armor TSS X X
Initiate study on the feasibility of electronic broadcast reprogramming X X
Improve or modify ARAT flagging capability for ELINT systems X X
Enhance MASINT database on-line capability X X
Integrate Electro-optic based systems into

reprogramming infrastructure.

X X
Design, develop and test communications

architecture paths to support CONUS to

OCONUS field unit communications.

X X
Begin to implement support plans for PM, Aviation Electronic Combat (SIRFC to AMPS interface) X X
Begin development of specific flagging models for AN/APR-39A(V)2 Radar Warning Receiver X X
Development of Multi-Service Electronic Combat Secure Web Site. X X
Finalize implementation of support plans for PM, Aviation Electronic Combat (SIRFC to AMPS interface) X X
Test and evaluate the communications architecture paths to support CONUS to OCONUS field unit communications X X
Finalize Flagging Model for the AN/APR-39A(V)2 Radar Warning Receiver X X
Begin Flagging Model for the Suite of Integrated RF Countermeasures (SIRFC) X X
Develop Training Materials for Commanders Staff & Unit level personnel (Warfighters Handbook) X X

*Denotes a completed effort
A. Project Cost Breakdown FY 1996 FY 1997 FY 1998 FY 1999
Government Engineering Support 425 510 511 524
Contract Engineering Support 1570 1837 1488 949
Development Support Equipment Acquisition 90 575 600 600
Operational Training 150 150 200 150
PM Support 300 300 700 700
Test and Evaluation 200 200 300 200
Travel 95 100 225 200
SBIR/STTR 92
Total 2830 3764 4024 3323

B. Budget Acquisition History and Planning Information: Not applicable
COST (In Thousands) FY 1996 Actual FY 1997 Estimate FY 1998 Estimate FY 1999 Estimate FY 2000 Estimate FY 2001 Estimate FY 2002 Estimate FY 2003 Estimate Cost to Complete Total Cost
DL16 TROJAN Development 517 1261 1278 1333 0 0 0 0 0 4389

A. Mission Description and Budget Item Justification: This project is a Tactical Intelligence and Related Activities (TIARA) program. A key factor in modern warfare is the ability to collect, process and use information about an adversary while preventing him from obtaining similar information. TROJAN is a combined operational and readiness mission system which uses advanced networking technology to provide seamless rapid radio relay, secure communications to include voice, data, facsimile, and electronic reconnaissance support to U.S. forces throughout the world. TROJAN operations may be easily tailored to fit military intelligence unit training schedules and surged during specific events to involve every aspect of the tactical intelligence collection, processing, analysis and reporting systems. This project engineers, tests and evaluates new digital intelligence collection, processing and dissemination technology using the fielded TROJAN systems, prior to the acquisition of those technologies. The process that will enable the United States to win the battlefield information war is referred to as digitization. This capability will allow us to process and disseminate real-time intelligence data from various sources; it forms the intelligence needed to issue orders inside the threat decision cycle. To that end, it is imperative the TROJAN system keep pace with digitization initiatives in order to respond aggressively to the emerging intelligence communication threats.

Acquisition Strategy: Competitive contract award utilizing firm fixed price and best value selection procedures for engineering and manufacturing development.

FY 1996 Accomplishments:
123 Conducted operational test, evaluation and engineering of video compression/processing technologies to the TROJAN intelligence processing workstation
394 Performed operational evaluation of specific TROJAN applications for non-standard modulations using digital signal processing technologies
Total 517

FY 1997 Planned Program:
375 Continue operational evaluation on specific TROJAN applications for non-standard modulations techniques using digital processing technologies (1Q97-4Q97)
328 Complete operational test, evaluation and engineering of video compression/processing technologies on fielded TROJAN systems
527 Acquire previously developed specialized software for classified pre-processing and enhanced signal processing algorithms
31 Small Business Innovation Research/Small Business Technology Transfer (SBIR/STTR)
Total 1261

FY 1998 Planned Program:
267 Operational test and evaluation of previously developed specialized software and enhanced signal processing algorithms
500 Implement and test Area Common User System (ACUS) Interfaces technology for the TROJAN intelligence network
511 Acquire and apply multi-bandwidth compression algorithm technology to maximize TROJAN intelligence collection network throughput
Total 1278

FY 1999 Planned Program:
512 Continue operational assessment of multi-bandwidth compression algorithm technology to maximize TROJAN intelligence collection network throughput
321 Apply IEW dissemination applications based on Task Force XXI lessons learned
500 Apply tactical transcription functionality at the RSOCs to support tactical to national partnership
Total 1333
B. Project Change Summary FY 1996 FY 1997 FY 1998 FY 1999
FY 1997 President's Budget 531 1288 1363 1430
Appropriated Value 536 1261
Adjustments to Appropriated Value -19
FY 1998 Pres Bud Request 517 1261 1278 1333
C. Other Program Funding Summary FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 To

Compl

Total

Cost

OPA BA0331 3176 2114 3349 3648 4505 4659 4770 4896 Cont'd Cont'd
OPA BA0333 15336 2085 479 478 0 0 0 0
D. Schedule Profile FY 1996 FY 1997 FY 1998 FY 1999
Acquisition Milestones 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
Contract Award for Video

Compression/Processing

X*
Contract Award for Non-Standard Mod

using Digital Signal Processing Tech.

X*
Contract Award for Spec Software for Sig

Proc Algorithms

X
Contract Award for enhanced Sig Proc

Algorithms

X
Contract Award for Area Common User

System (ACUS) Interfaces for TROJAN

Intel Network

X
Contract Award for Multi-bandwidth

compression algorithms

X
Contract Award for dissemination

applications

X
Contract Award for Transcription

Functionality at the RSOCs

X
Engineering Milestones
Prototype insertion-video

compression/processing



X X
Spec software for signal processing

algorithms

X
Enhanced signal processing algorithms X
Area Common User System (ACUS)

interface for TROJAN Intel Net

X
Multi-bandwidth compression algorithms X
Dissemination applications X
Transcription functionality at RSOCs X

*Denotes a completed effort
A. Project Cost Breakdown FY 1996 FY 1997 FY 1998 FY 1999
Hardware Development 312 753 760 792
Software Development 205 477 518 541
SBIR/STTR 31
Total 517 1261 1278 1333

B. Budget Acquisition History and Planning Information

Performing Organizations
Contractor or Government Performing Activity Contract Method/Type or Funding Vehicle Award or Obligation Date Performing Activity EAC Project Office

EAC



Total Prior to FY 1996
FY 1996 FY 1997 FY 1998 FY 1999 Budget to Complete Total Program
Product Development Organizations: None
Support and Management Organizations:
Misc. C/CPFF

MIPR

MIPR

MIPR

Mar 96

Jan 97

Jan 98

Jan 99

517

1261

1278

1333

517

1261

1278

1333

0 517 1230 1278 1333 4358
SBIR/STTR 31 31
Test and Evaluation Organizations: None


Government Furnished Property: None
Subtotal Product Development
Subtotal Support and Management 517 1261 1278 1333 4389
Subtotal Test and Evaluation
Total Project 517 1261 1278 1333 4389
COST (In Thousands) FY 1996 Actual FY 1997 Estimate FY 1998 Estimate FY 1999 Estimate FY 2000 Estimate FY 2001 Estimate FY 2002 Estimate FY 2003 Estimate Cost to Complete Total Cost
DL18 SHORTSTOP Development 6800 9151 0 0 0 0 0 0 0 24475

A. Mission Description and Budget Item Justification SHORTSTOP development is the continuation of the SHORTSTOP program which was initiated as a Quick Reaction Program (QRP) to a CENTCOM Statement of Need (SON) developed in the early part of Operation Desert Shield/Desert Storm. Thirty six Limited Procurement Urgent units (AN/VLQ-9) were procured and fourteen have been upgraded to a multi-band configuration (AN/VLQ-10). Sixteen AN/VLQ-9s and ten AN/VLQ-10s are currently deployed in Bosnia in support of Operation Joint Endeavor. The SHORTSTOP Operational Requirements Document, approved Apr 94, calls for a system with a lightweight autonomous configuration which shall be quickly and easily deployed via vehicles or manpack. In order to maximize tactical utility, it further requires that the set be capable of operation from either a battery or suitable external power source. The current EMD program for the SHORTSTOP Electronic Protection System will provide a lightweight, fully integrated Radio Frequency Countermeasure system to provide protection for personnel and other high value assets against proximity fuzed munitions. There will be three configurations of the SHORTSTOP Electronic Protection System: a manpack system, a stand alone system, and a vehicle mounted system. SHORTSTOP will be used by Infantry, Engineering, Armored, Field Artillery, and Intelligence units to enhance survivability.

Acquisition Strategy: A contract was awarded in July 1994 on a competitive basis for the development of a lightweight autonomous configuration of the SHORTSTOP Electronic Protection System.

FY 1996 Accomplishments:
4369 Completed hardware design
1336 Completed software design and began integration with hardware
1095 Began fabrication of nine (9) prototypes
Total 6800

FY 1997 Planned Program:
6032 Complete fabrication/contractor qualification testing of nine (9) prototypes
500 Award T&M contract for support of Government Technical and Operation Test
485 Design/fabricate Fuze Immulator to support testing
435 Design/develop 1553 instrumentation data interface to support live fire test
95 Develop installation kit for vehicle mount version
1380 Conduct technical and operational test
224 Small Business Innovation Research/Small Business Technology Transfer (SBIR/STTR)
Total 9151

FY 1998 Planned Program: Project not funded in FY 98

FY 1999 Planned Program: Project not funded in FY 99
B. Project Change Summary FY 1996 FY 1997 FY 1998 FY 1999
FY 1997 President's Budget 7488 9348 0 0
Appropriated Value 7563 9151 0 0
Adjustments to Appropriated Value -763
FY 1998 Pres Bud Request 6800 9151 0 0
C. Other Program Funding Summary FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 To Total
Other Procurement, Army Compl Cost
SSN: VA8000 - SHORTSTOP 0 5000 0 0 0 0 0 0 0 5000
D. Schedule Profile FY 1996 FY 1997 FY 1998 FY 1999
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
Complete hardware design X*
Complete software design and begin integration with hardware X*
Begin fabrication of nine (9) prototypes X*
Complete fabrication of nine (9)

prototypes

X
Conduct contractor qualification testing X
Award T&M support contract X
Design/Fabricate Fuze Immulator X
Design/develop 1553 instrumentation data interface X
Develop installation kits X
Deliver nine (9) EMD prototypes X
Conduct Technical Test X
Conduct Operational Test X

*Denotes completed milestone
A. Project Cost Breakdown FY 1996 FY 1997 FY 1998 FY 1999
Primary Hardware Development 5626 4962
Test and Evaluation 2875
Government Engineering Support 735 731
Program Management Support 439 359
SBIR/STTR 224
Total 6800 9151

B. Budget Acquisition History and Planning Information: Not Applicable
COST (In Thousands) FY 1996 Actual FY 1997 Estimate FY 1998 Estimate FY 1999 Estimate FY 2000 Estimate FY 2001 Estimate FY 2002 Estimate FY 2003 Estimate Cost to Complete Total Cost
D665 Aircraft Survivability Equipment Development 38743 43645 46870 37248 6144 4684 8129 14091 Continuing Continuing

A. Mission Description and Justification: Aircraft Survivability Equipment Development provides for the development and system integration of Aircraft Survivability Equipment (ASE) to achieve survivability, reduce vulnerability, and enhance combat effectiveness required to fulfill special electronic mission aircraft (SEMA), attack/scout, and assault/cargo mission requirements. Equipment developed will increase combat effectiveness and potential for mission accomplishment by reducing or eliminating the ability of threat air defense systems to detect, hit, damage or destroy Army aircraft. Developments respond to the approved requirements documents, test and type classification for production and fielding of ASE systems to address infrared, radar, laser and optical/electro-optical directed air defense threats. Efforts in development include new or upgraded systems to counter monopulse, millimeter wave, frequency agile, pulse doppler and continuous wave radars, passive infrared missile seekers and laser directed weapon systems. Continual adjustments are made to this program to meet the changing and evolutionary nature of technology and threat. This program has joint service applications that are coordinated through the Joint Technical Coordinating Group for Aircraft Survivability (JTCG/AS), as well as NATO applications coordinated through DoD. This project also provides the technical base for electronic warfare equipment for Comanche and Special Operations Aircraft. The projects in this program element support research efforts that complete Demonstration/Validation (Dem/Val) prototype efforts and transition into the Engineering and Manufacturing Development (EMD) phase of the acquisition strategy and are, therefore, correctly placed in Budget Activity 5.

Acquisition Strategy: Project is comprised of multiple programs which have been competitively awarded.

FY 1996 Accomplishments:
15950 Continued EMD of Suite of Integrated Infrared Countermeasure (SIIRCM). New nomenclature assigned - formerly ATIRCM/CMWS.
3246 Continued EMD of Advanced Infrared Countermeasure Munitions (AIRCMM)
15704 Continued EMD of the AN/ALQ-211 Suite of Integrated Radio Frequency Countermeasures (SIRFC). New nomenclature assigned - formerly ATRJ
1171 Continued development of Advanced Visual-Electro-Optical Signature Suppression and Analysis (AVESSA)
250 Continued integration efforts of ASE systems
2422 Continued in-house and program management administration
Total 38743

FY 1997 Planned Program:
19431 Continue EMD of SIIRCM
2530 Continue EMD of AIRCMM
16228 Continue EMD of SIRFC
1139 Continue development of AVESSA
FY 1997 Planned Program: (continued)
100 Complete integration efforts of ASE systems
3226 Continue in-house and program management administration
991 Small Business Innovative Research/Small Business Technical Transfer (SBIR/STTR)
Total 43645

FY 1998 Planned Program:
28968 Continue EMD of SIIRCM
1897 Continue EMD of the AIRCMM
11964 Continue EMD of SIRFC
800 Continue development of AVESSA
3241 Continue in-house and program management administration
Total 46870

FY 1999 Planned Program:
27859 Continue EMD of SIIRCM
1250 Complete EMD of the AIRCMM
4000 Complete EMD of the SIRFC
554 Complete development of AVESSA
3585 Continue in-house and program management administration
Total 37248
B. Project Change Summary FY 1996 FY 1997 FY 1998 FY 1999
FY 1997 President's Budget 38828 38579 34606 34542
Appropriated Value 39219 43645
Adjustments to Appropriated Value -476
FY 1998 Pres Bud Request 38743 43645 46870 37248

Change Summary Explanation: Funding: +12264 of ASE APA, BA4 AZ3504 was converted to RDT&E in FY98; +2706 of ASE APA, BA4 AZ3504 was converted to

RDT&E in FY99.

C. Other Program Funding Summary FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 To

Compl

Total

Cost

APA, BA 4 AZ3504 ASE 50109 436 905 34412 46203 41601 100667 104090 Cont Cont
APA, BA 2 AA0720 ASE Modifications 12915 25777 4578 3922 11982 22592 17975 15351 Cont Cont
D. Schedule Profile FY 1996 FY 1997 FY 1998 FY 1999
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
Continue EMD of SIIRCM X
Continue EMD of AIRCMM X
Continue EMD of SIRFC X
Continue dev of AVESSA X
Continue EMD of SIIRCM X
Continue EMD of AIRCMM X
Continue EMD contract of SIRFC X
Continue dev of AVESSA X
Continue EMD of SIIRCM X
Continue EMD of AIRCMM X
Continue EMD of SIRFC X
Continue EMD of AVESSA X
Continue EMD of SIIRCM X
Complete EMD of AIRCMM X
Complete EMD of SIRFC X
Complete development of AVESSA X
A. Project Cost Breakdown FY 1996 FY 1997 FY 1998 FY 1999
R&D Contracts 32091 33534 31209 18156
Test and Evaluation 432 1724 8557 11536
Government Engineering Support 1177 1124 704 549
Program Management Engineering Support 5043 6272 6400 7007
SBIR/STTR 991
Total 38743 43645 46870 37248

B. Budget Acquisition History and Planning Information:

Performing Organizations
Contractor or Government Performing Activity Contract Method/Type or Funding Vehicle Award or Obligation Date Performing Activity EAC Project Office

EAC

Total Prior to FY 1996 FY 1996 FY 1997 FY 1998 FY 1999 Budget to Complete Total Program
Product Development Organizations: Note: Miscellaneous includes funding to various activities (ATCOM, St. Louis, MO/CECOM, Fort Monmouth, NJ) for ASE programs
Thiokol (AIRCMM) C/CPIF Sep 95 6740 6740 1000 2300 1710 1070 660 0 6740
ITT Corp (SIRFC) C/CPAF Jul 94 55756 55756 19450 15018 14700 5337 1140 111 55756
Sanders(ATIRCM) C/CPAF Sep 95 57910 57910 2282 12414 10981 19879 12218 136 57910
Misc. Contracts 6980 2359 6143 4923 4138 Cont Cont
Misc. MIPR 1099 1177 1124 704 549 Cont Cont
Support and Management Organizations : Note: Miscellaneous includes funding to various activities (ATCOM, St. Louis, MO/CECOM, Fort Monmouth, NJ) for ASE programs
Support Contracts C/FFP Nov 94 562 545 640 515 515 Cont Cont
Misc. MIPR 6522 4498 5632 5885 6492 Cont Cont
Test and Evaluation Organizations: Note: Miscellaneous includes funding to various activities for ASE programs.
Misc. MIPR 853 432 1411 1525 254 Cont Cont
TECOM MIPR 3069 8446 0 11515
EPG MIPR 313 3963 2836 7112
SBIR/STTR 991 0 991

Government Furnished Property: None
Total

Prior to

FY1996

FY 1996

FY 1997 FY 1998 FY 1999 Budget to

Complete



Total

Program

Subtotal Product Development 30811 33268 34658 31913 18705 Cont Cont
Subtotal Support and Management 7084 5043 6272 6400 7007 Cont Cont
Subtotal Test and Evaluation 853 432 1724 8557 11536 Cont Cont
SBIR/STIR 991 0 991
Total Project 38748 38743 43645 46870 37248 Cont Cont
COST (In Thousands) FY 1996 Actual FY 1997 Estimate FY 1998 Estimate FY 1999 Estimate FY 2000 Estimate FY 2001 Estimate FY 2002 Estimate FY 2003 Estimate Cost to Complete Total Cost
D2VT Suite of Integrated Infrared Countermeasures Operational Test (SIIRCM) 0 0 166 2358 116 0 0 0 0 2640


A. Mission Description and Justification: This project supports the operational test for the Suite of Integrated Infrared Countermeasures (SIIRCM) and is new start in

FY 1998. This project will provide active and passive Infrared Countermeasure (IRCM) protection against infrared guided weapons. The system is designed to meet operational requirements for a modular IRCM system capable of providing awareness and self protection jamming countermeasures. The system is applicable to the AH-64, MH-47E, MH-60K, RC-12K, EH-60, UH-60, and CH-47D aircraft. The program has been designated a Tri-Service program, with application to the Air Force and Navy aircraft.

Acquisition Strategy: Not applicable

FY 1996 Accomplishments: Project not funded in FY 96

FY 1997 Planned Program: Project not funded in FY 97

FY 1998 Planned Program:
166 Commence SIIRCM Operational Test Support
Total 166

FY 1999 Planned Program:
2358 Continue SIIRCM Operational Test Support
Total 2358
B. Project Change Summary FY 1996 FY 1997 FY 1998 FY 1999
FY 1997 President's Budget 0 0 0 0
Appropriated Value 0
Adjustments to Appropriated Value
FY 1998 Pres Bud Request 0 0 166 2358

Change Summary Explanation: Funding: Project initiated in FY 1998 to support SIIRCM operational test. (FY 98 +166; FY99 +2358)
C. Other Program Funding Summary FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 To

Compl

Total

Cost

APA, BA 4 AZ3507 ASE (ATIRCM) 10634 18064 13649 64557 67842 Cont Cont
APA, BA 2 AA0720 ASE Modifications* (ATIRCM) 9167 1112 9396 13657 14835 15351 Cont Cont

*Represents only part of the funding in this SSN.
D. Schedule Profile FY 1996 FY 1997 FY 1998 FY 1999
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
Initiate SIIRCM Test Support X
Continue SIIRCM Test Support X
A. Project Cost Breakdown FY 1996 FY 1997 FY 1998 FY 1999
Test and Evaluation 166 2358
Total 166 2358

B. Budget Acquisition History and Planning Information

Performing Organizations
Contractor or Government Performing Activity Contract Method/Type or Funding Vehicle Award or Obligation Date Performing Activity EAC Project Office

EAC



Total

Prior to

FY 1996

FY 1996 FY 1997 FY 1998 FY 1999 Budget to Complete Total Program
Product Development Organizations: None
Support and Management Organizations: None
Test and Evaluation Organizations:
OPTEC 166 2358 116 2640

Government Furnished Property: None
Subtotal Product Development
Subtotal Support and Management
Subtotal Test and Evaluation 166 2358 116 2640
Total Project 166 2358 116 2640