FY98 Program Element Descriptive Summaries / RDDS

0603766A Tactical Exploitation of National Capabilities (TENCAP) - Dem/Val (TIARA)

COST (In Thousands) FY 1996 Actual FY 1997 Estimate FY 1998 Estimate FY 1999 Estimate FY 2000 Estimate FY 2001 Estimate FY 2002 Estimate FY 2003 Estimate Cost to Complete Total Cost
D907 Tactical Exploitation of National Capabilities - Adv Dev 26796 25354 20920 23714 24751 29020 30920 31095 Continuing Continuing

A. Mission Description and Budget Item Justification: Supports the tactical commander's intelligence requirements for contingency force development and deep battle targeting as stated in Field Manual 100-5. Specific developments are managed within the Army's Tactical Exploitation of National Capabilities (TENCAP) program. The scope of the program is to leverage specific data and capabilities available from existing and emerging national and selected theater capabilities that meet stated Army tactical intelligence information and targeting needs. This project supports the advanced development/enhancement of the Electronic Tactical User Terminal (ETUT), Mobile Integrated Tactical Terminal (MITT), Forward Area Support Terminal (FAST), Tactical Exploitation System (TES), and Advanced Electronic Processing and Dissemination System (AEPDS). The Army's emerging TES will incorporate the standards and protocols dictated by the Common Imagery Ground Surface System (CIGSS) program. TES brings all of the existing and emerging Army TENCAP capabilities [AEPDS, Modernized Imagery Exploitation System (MIES), and Enhanced Tactical Radar Correlator (ETRAC)] into an integrated common baseline; downsized modular and scaleable to meet a wide range of contingency requirements. TENCAP Common Baseline addresses common subsystems, planned improvements, key activities and ongoing/planned initiatives determined to have potential application to multiple TENCAP systems, including MIES and ETRAC that are funded under the Defense Airborne Reconnaissance Program (DARP) (PE 0305154D). Specific details are provided in the Tactical Intelligence and Related Activities (TIARA) Congressional Justification Book, Volume II, and in the Army TENCAP Master Plan. This Program Element (PE) focuses on efforts associated with advanced technology development used to demonstrate general military utility to include demonstration and validation in the area of TENCAP and is correctly placed in Budget Activity 4.

Acquisition Strategy: The Army Space Program Office (ASPO) strives for an acquisition environment emphasizing stable funding, low density acquisition, minimal use of MILSPECS, and managed competition. By tailoring existing technology, leveraging the best commercial practices, and using commercial and government off the shelf software, ASPO minimizes risk while maximizing efficiency. Strong user involvement, a robust operations and maintenance program and a vigorous technology insertion effort ensure programmatic success. Finally, dedicated cradle to grave Integrated Logistics Support (ILS) for TENCAP systems is accomplished through a coordinated effort by government and contractor personnel and facilities.

FY 1996 Accomplishments:
10550 Continued to pursue technology for the refinement of the TENCAP Common Baseline for fully exploiting national capabilities to meet emerging worldwide contingency scenarios such as upgrades to Communication System Processor (CSP) to incorporate Tactical Packet Network (TPN) and Defense Switched Network (DSN) connectivity, the Demand Assigned Multiple Access (DAMA) appliqué to SUCCESS radios and support to the Joint Collection Management Tool (JCMT).
5596 Initiated design concept and prototype development of Tactical Exploitation Systems (TES) with state-of-the-art hardware and software.
FY 1996 Accomplishments: (continued)
2434 Completed advanced development effort to retrofit ETUTs with enhanced MITT hardware and software.
5120 Continued support to TENCAP program management with administrative activities [e.g., FFRDC (Aerospace), ASPO, systems engineering technical support (SETA), and Topographic Engineering Center (TEC)].
3096 Continued support to efforts being developed under PE 0305154D (DARP) Project P531 (e.g., FFRDC (Aerospace), ASPO, SETA, and TEC).
Total 26796

FY 1997 Planned Program:
8082 Continue to pursue technology for the refinement of the TENCAP common baseline for fully exploiting national capabilities to meet emerging worldwide contingency scenarios
10027 Initiate advanced development efforts for ground processing technologies for new national sensors capabilities that will be incorporated into TES
5077 Continue support to TENCAP program management with administrative activities (e.g., FFRDC (Aerospace), ASPO, SETA, and TEC).
1579 Continue support to efforts being developed under PE 0305154D (DARP) Project P531 (e.g., FFRDC (Aerospace), ASPO, SETA, and TEC).
589 Small Business Innovation Research (SBIR)/Small Business Technology Transfer (STTR)
Total 25354

FY 1998 Planned Program:
5327 Continue to pursue technology for the refinement of the TENCAP common baseline for fully exploiting national capabilities to meet emerging worldwide contingency scenarios. In addition to staying current with national and theater capabilities, will include integration of Defense Switched Network (DSN) and Defense Message System (DMS) into the TENCAP systems.
8775 Continue advanced development of TES Program
4432 Continue support to TENCAP program management with administrative activities (e.g., FFRDC (Aerospace), ASPO, SETA, and TEC).
2386 Continue support to efforts being developed under PE 0305154D (DARP) Project P531 (e.g., FFRDC (Aerospace), ASPO, SETA, and TEC).
Total 20920

FY 1999 Planned Program:
5802 Continue to pursue technology for the refinement of the TENCAP common baseline for fully exploiting national capabilities to meet emerging worldwide contingency scenarios. In addition to staying current with National and Theater Capabilities, will include integration of Defense Switched Network (DSN) and Defense Message System (DMS) into the TENCAP systems
9849 Continue advanced development of TES Program.
5258 Continue support to TENCAP program management with administrative activities (e.g., FFRDC (Aerospace), ASPO, SETA, and TEC).
2805 Continue support to efforts being developed under PE 0305154D (DARP) Project P531 (e.g., FFRDC (Aerospace), ASPO, SETA, and TEC).
Total 23714
B. Project Change Summary FY 1996 FY 1997 FY 1998 FY 1999
FY 1997 President's Budget 27460 26060 23200 27094
Appropriated Value 27738 25354
Adjustments to Appropriated Value -942
FY 1998 BES/Pres Bud Request 26796 25354 20920 23714

Change Summary Explanation: Funding - FY 98 & FY 99 reductions are for Spares Pricing Adjustment, T&E Streamlining and civilian salary reduction as result of HQDA redesign. (FY 98 -2280/FY 99 -3380).
C. Other Program Funding Summary FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 To Compl Total Cost
RDTE, A Budget Activity 5
PE 64766.D909 TENCAP 23266 15235 19113 19531 26094 25097 28203 28359 Cont Cont
RDTE, D Budget Activity 7
PE 0305154D DARP 41526 50287 0 0 0 0 0 0 Cont Cont
PE 0305208D DARP 30433 28175 22214 24108 23583 23179
Other Procurement Army, OPA-2
BZ 7315 TENCAP 4473 1756 1679 1728 4598 13703 14779 16822 Cont Cont
Procurement, Defense Wide
PE 0305154D DARP 80822 89945 0 0 0 0 0 0 Cont Cont
PE 0305208D DARP 94070 81600 80576 71867 73926 75239
D. Schedule Profile FY 1996 FY 1997 FY 1998 FY 1999
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
Initiate Prototype Development for TES X*
Complete Adv Dev of DAMA Appliqué into TENCAP Common Baseline SUCCESS Radios X
Initiate Integration of DSN/DMS into TENCAP Systems X
Complete Prototype Development TES Forward X
Complete Integration of DSN/DMS into TENCAP System X

*Denotes completed milestone
A. Project Cost Breakdown FY 1996 FY 1997 FY 1998 FY 1999
Common Baseline (*1) 10550 8082 5327 5802
TES 5596 10027 8775 9849
ETUT 2434 0
ASPO In-House (*2, *3) 2507 2135 1995 1871
FFRDC 219 87 97 106
System Engineering (Contractor) (*2) 4115 3234 3692 5051
System Engineering (Government) (*2) 1375 1200 1034 1035
SBIR/STTR 589
Total 26796 25354 20920 23714

(*1) TENCAP Common Baseline addresses common subsystems, planned improvements, key activities and ongoing/planned initiatives determined to have potential application to multiple TENCAP systems [including MIES and ETRAC that are funded under the DARP (PE 0305154D)].

(*2) Approximately 40% of program management cost in FY 1996 through FY 1999 support efforts being developed under PE 0305154D.P531.

(*3) The ASPO In-House support in this project also supports efforts being developed under PE 0604766A.D909.

B. Budget Acquisition History and Planning Information: Not Applicable

THIS PAGE INTENTIONALLY LEFT BLANK