COST (In Thousands) | FY 1996 Actual | FY 1997 Estimate | FY 1998 Estimate | FY 1999 Estimate | FY 2000 Estimate | FY 2001 Estimate | FY 2002 Estimate | FY 2003 Estimate | Cost to Complete | Total Cost | |
D907 | Tactical Exploitation of National Capabilities - Adv Dev | 26796 | 25354 | 20920 | 23714 | 24751 | 29020 | 30920 | 31095 | Continuing | Continuing |
A. Mission Description and Budget Item Justification: Supports the tactical commander's intelligence requirements for contingency force development and deep battle targeting as stated in Field Manual 100-5. Specific developments are managed within the Army's Tactical Exploitation of National Capabilities (TENCAP) program. The scope of the program is to leverage specific data and capabilities available from existing and emerging national and selected theater capabilities that meet stated Army tactical intelligence information and targeting needs. This project supports the advanced development/enhancement of the Electronic Tactical User Terminal (ETUT), Mobile Integrated Tactical Terminal (MITT), Forward Area Support Terminal (FAST), Tactical Exploitation System (TES), and Advanced Electronic Processing and Dissemination System (AEPDS). The Army's emerging TES will incorporate the standards and protocols dictated by the Common Imagery Ground Surface System (CIGSS) program. TES brings all of the existing and emerging Army TENCAP capabilities [AEPDS, Modernized Imagery Exploitation System (MIES), and Enhanced Tactical Radar Correlator (ETRAC)] into an integrated common baseline; downsized modular and scaleable to meet a wide range of contingency requirements. TENCAP Common Baseline addresses common subsystems, planned improvements, key activities and ongoing/planned initiatives determined to have potential application to multiple TENCAP systems, including MIES and ETRAC that are funded under the Defense Airborne Reconnaissance Program (DARP) (PE 0305154D). Specific details are provided in the Tactical Intelligence and Related Activities (TIARA) Congressional Justification Book, Volume II, and in the Army TENCAP Master Plan. This Program Element (PE) focuses on efforts associated with advanced technology development used to demonstrate general military utility to include demonstration and validation in the area of TENCAP and is correctly placed in Budget Activity 4.
Acquisition Strategy: The Army Space Program Office (ASPO) strives for an acquisition environment emphasizing stable funding, low density acquisition, minimal use of MILSPECS, and managed competition. By tailoring existing technology, leveraging the best commercial practices, and using commercial and government off the shelf software, ASPO minimizes risk while maximizing efficiency. Strong user involvement, a robust operations and maintenance program and a vigorous technology insertion effort ensure programmatic success. Finally, dedicated cradle to grave Integrated Logistics Support (ILS) for TENCAP systems is accomplished through a coordinated effort by government and contractor personnel and facilities.
FY 1996 Accomplishments:
10550 | Continued to pursue technology for the refinement of the TENCAP Common Baseline for fully exploiting national capabilities to meet emerging worldwide contingency scenarios such as upgrades to Communication System Processor (CSP) to incorporate Tactical Packet Network (TPN) and Defense Switched Network (DSN) connectivity, the Demand Assigned Multiple Access (DAMA) appliqué to SUCCESS radios and support to the Joint Collection Management Tool (JCMT). | |
5596 | Initiated design concept and prototype development of Tactical Exploitation Systems (TES) with state-of-the-art hardware and software. |
FY 1996 Accomplishments: (continued) |
2434 | Completed advanced development effort to retrofit ETUTs with enhanced MITT hardware and software. | |
5120 | Continued support to TENCAP program management with administrative activities [e.g., FFRDC (Aerospace), ASPO, systems engineering technical support (SETA), and Topographic Engineering Center (TEC)]. | |
3096 | Continued support to efforts being developed under PE 0305154D (DARP) Project P531 (e.g., FFRDC (Aerospace), ASPO, SETA, and TEC). | |
Total | 26796 |
FY 1997 Planned Program:
8082 | Continue to pursue technology for the refinement of the TENCAP common baseline for fully exploiting national capabilities to meet emerging worldwide contingency scenarios | |
10027 | Initiate advanced development efforts for ground processing technologies for new national sensors capabilities that will be incorporated into TES | |
5077 | Continue support to TENCAP program management with administrative activities (e.g., FFRDC (Aerospace), ASPO, SETA, and TEC). | |
1579 | Continue support to efforts being developed under PE 0305154D (DARP) Project P531 (e.g., FFRDC (Aerospace), ASPO, SETA, and TEC). | |
589 | Small Business Innovation Research (SBIR)/Small Business Technology Transfer (STTR) | |
Total | 25354 |
FY 1998 Planned Program:
5327 | Continue to pursue technology for the refinement of the TENCAP common baseline for fully exploiting national capabilities to meet emerging worldwide contingency scenarios. In addition to staying current with national and theater capabilities, will include integration of Defense Switched Network (DSN) and Defense Message System (DMS) into the TENCAP systems. | |
8775 | Continue advanced development of TES Program | |
4432 | Continue support to TENCAP program management with administrative activities (e.g., FFRDC (Aerospace), ASPO, SETA, and TEC). | |
2386 | Continue support to efforts being developed under PE 0305154D (DARP) Project P531 (e.g., FFRDC (Aerospace), ASPO, SETA, and TEC). | |
Total | 20920 |
FY 1999 Planned Program:
5802 | Continue to pursue technology for the refinement of the TENCAP common baseline for fully exploiting national capabilities to meet emerging worldwide contingency scenarios. In addition to staying current with National and Theater Capabilities, will include integration of Defense Switched Network (DSN) and Defense Message System (DMS) into the TENCAP systems | |
9849 | Continue advanced development of TES Program. | |
5258 | Continue support to TENCAP program management with administrative activities (e.g., FFRDC (Aerospace), ASPO, SETA, and TEC). | |
2805 | Continue support to efforts being developed under PE 0305154D (DARP) Project P531 (e.g., FFRDC (Aerospace), ASPO, SETA, and TEC). | |
Total | 23714 |
B. Project Change Summary | FY 1996 | FY 1997 | FY 1998 | FY 1999 |
FY 1997 President's Budget | 27460 | 26060 | 23200 | 27094 |
Appropriated Value | 27738 | 25354 | ||
Adjustments to Appropriated Value | -942 | |||
FY 1998 BES/Pres Bud Request | 26796 | 25354 | 20920 | 23714 |
Change Summary Explanation: Funding - FY 98 & FY 99 reductions are for Spares Pricing Adjustment, T&E Streamlining and civilian salary reduction as result of HQDA redesign. (FY 98 -2280/FY 99 -3380).
C. Other Program Funding Summary | FY 1996 | FY 1997 | FY 1998 | FY 1999 | FY 2000 | FY 2001 | FY 2002 | FY 2003 | To Compl | Total Cost |
RDTE, A Budget Activity 5 | ||||||||||
PE 64766.D909 TENCAP | 23266 | 15235 | 19113 | 19531 | 26094 | 25097 | 28203 | 28359 | Cont | Cont |
RDTE, D Budget Activity 7 | ||||||||||
PE 0305154D DARP | 41526 | 50287 | 0 | 0 | 0 | 0 | 0 | 0 | Cont | Cont |
PE 0305208D DARP | 30433 | 28175 | 22214 | 24108 | 23583 | 23179 | ||||
Other Procurement Army, OPA-2 | ||||||||||
BZ 7315 TENCAP | 4473 | 1756 | 1679 | 1728 | 4598 | 13703 | 14779 | 16822 | Cont | Cont |
Procurement, Defense Wide | ||||||||||
PE 0305154D DARP | 80822 | 89945 | 0 | 0 | 0 | 0 | 0 | 0 | Cont | Cont |
PE 0305208D DARP | 94070 | 81600 | 80576 | 71867 | 73926 | 75239 |
D. Schedule Profile | FY 1996 | FY 1997 | FY 1998 | FY 1999 |
1 | 2 | 3 | 4 | 1 | 2 | 3 | 4 | 1 | 2 | 3 | 4 | 1 | 2 | 3 | 4 | |
Initiate Prototype Development for TES | X* | |||||||||||||||
Complete Adv Dev of DAMA Appliqué into TENCAP Common Baseline SUCCESS Radios | X | |||||||||||||||
Initiate Integration of DSN/DMS into TENCAP Systems | X | |||||||||||||||
Complete Prototype Development TES Forward | X | |||||||||||||||
Complete Integration of DSN/DMS into TENCAP System | X |
*Denotes completed milestone
A. Project Cost Breakdown | FY 1996 | FY 1997 | FY 1998 | FY 1999 |
Common Baseline (*1) | 10550 | 8082 | 5327 | 5802 |
TES | 5596 | 10027 | 8775 | 9849 |
ETUT | 2434 | 0 | ||
ASPO In-House (*2, *3) | 2507 | 2135 | 1995 | 1871 |
FFRDC | 219 | 87 | 97 | 106 |
System Engineering (Contractor) (*2) | 4115 | 3234 | 3692 | 5051 |
System Engineering (Government) (*2) | 1375 | 1200 | 1034 | 1035 |
SBIR/STTR | 589 | |||
Total | 26796 | 25354 | 20920 | 23714 |
(*1) TENCAP Common Baseline addresses common subsystems, planned improvements, key activities and ongoing/planned initiatives determined to have potential application to multiple TENCAP systems [including MIES and ETRAC that are funded under the DARP (PE 0305154D)].
(*2) Approximately 40% of program management cost in FY 1996 through FY 1999 support efforts being developed under PE 0305154D.P531.
(*3) The ASPO In-House support in this project also supports efforts being developed under PE 0604766A.D909.
B. Budget Acquisition History and Planning Information: Not Applicable
THIS PAGE INTENTIONALLY LEFT BLANK