Mission Description and Budget Item Justification: This program develops Information Systems Security (ISS) equipment and techniques required to combat threat
Signal Intelligence capabilities and to insure our data network integrity. The Army's RDTE ISS program objective is to implement National Security Agency (NSA)
developed security technology in Army information systems. The Communications Security Equipment Technology (COMSEC) is to insure total signals and data security
of all Army information systems, to include any operational enhancement and specialized Army configurations. The Army Key Management System (AKMS) automates
key generation and distribution while supporting joint interoperability. It provides communications and network planning with key management on a single platform.
AKMS is a part of the management/support infrastructure for the Warfighter Information Network (WIN) program. Additional modifications to the AKMS baseline shall be
required to support the emerging WIN architecture. System security engineering, integration of available information security (INFOSEC) products, development (when
required), and testing are services provided to ensure that C4I systems are protected against malicious or accidental attacks by our enemies or friends. Several joint
service/NSA working groups exist in the area of key management to avoid duplication and to assure interoperability between all Services' systems to include standards and
testing. For the emerging multilevel network security, the Defense Information Systems Agency (DISA) Multi-Level Security (MLS) working group coordinates the
Services different technology efforts. The National Security Agency reviews each service RDT&E program to avoid duplication between and with their own. These
projects support development of upgrades to current production vehicles and are appropriately funded in Budget Activity 7.
|
COST (In Thousands) |
FY 1996
Actual |
FY 1997
Estimate |
FY 1998
Estimate |
FY 1999
Estimate |
FY 2000
Estimate |
FY 2001
Estimate |
FY 2002
Estimate |
FY 2003
Estimate |
Cost to
Complete |
Total Cost |
D491 |
Communications Security Equipment Technology
(COMSEC) |
2240 |
2574 |
6201 |
2564 |
6217 |
5980 |
7889 |
8188 |
Continuing |
Continuing |
A. Mission Description and Budget Item Justification: Project D491 - Communications Security Equipment Technology: Project implements National Security
Agency (NSA) developed security technology in Army information systems. Project objectives are to provide systems security mechanisms through encryption, trusted
software or standard operating procedures to protect the information and to integrate these mechanisms into specified systems so secure operations are as transparent as
possible to the users. This entails performing architecture studies and modeling, development models, system integration and testing, installation kits and certifications and
accreditations of Automation Information Systems.
Acquisition Strategy: Initial Operational Testing and Evaluation (IOTE) for Tactical End-to-End Encryption Device (TEED) will be done during Task Force XXI in
FY 97. The Production Milestone decision will be made after the Joint Warfighter Demonstration in Fall FY 97.
FY 1996 Accomplishments:
|
1200 |
Continued development of TEED Internet Security Manager, completed critical design review, initiated software coding to perform network management
security services of Key Management, Audit, and Access Control |
|
506 |
Continued development of re-programmable COMSEC/TRANSEC using Cypris Module or Digital Signal Processing (DSP) chips for embedment into
speakeasy programmable digital radio. |
|
534 |
Initiated engineering and manufacturing development (EMD) at Baton TEED - a security device for Internet Protocol (IP) as well as Asynchronous
Transfer Mode (ATM) networks. |
Total |
2240 |
|
FY 1997 Planned Program:
|
2574 |
Delivery of TEED Internet Security Manager (TISM) for usage with TEED and Integrated System Controller (ISYCON); testing in Army/Joint and
civilian test bed begins, testing of reprogrammable COMSEC/TRANSEC in tactical settings. Continues EMD TEED development. EMD TEED will
protect Army computer network users from hackers, deception and other forms of electronic attack on the Internet. Begin "electronic operations"
research to investigate techniques to counter electronic terrorism virus and masquerade against Army assets. |
Total |
2574 |
|
FY 1998 Planned Program:
|
2200 |
Support NSA TACLANE Program. |
|
940 |
Evaluation of Commercial INFOSEC (COMSEC & COMPUSEC) equipments, support to Speakeasy Program, evaluation of New COMSEC Chips for
embedding and development of new installation kits for TACLANE. |
|
3061 |
Initiate development of common tools set for C2 Protect, and initiate efforts to determine System Vulnerabilities (Information Operations/Warfare) |
|
|
|
Total |
6201 |
|
FY 1999 Planned Program:
|
721 |
Perform in-house evaluations and integrations of INFOSEC equipments such as COMSEC foreign nation releasable chips, high speed encryptors, trusted
computer platforms and secure applications. |
|
200 |
Perform in-house study for Secure Gateway and provide support to TACLANE program. |
|
376 |
Prepare procurement packages for FY00 award for the Secure Gateway, wireless LAN, Personal Communications Services COMSEC, NDI evaluation,
and installation support/acquisition contracts. |
|
1267 |
Continue common tool set and Vulnerability determination for C2 Protect (Information Operations/Warfare) |
Total |
2564 |
|
B. Project Change Summary |
FY 1996 |
FY 1997 |
FY 1998 |
FY 1999 |
FY 1997 President's Budget |
2350 |
2574 |
940 |
1297 |
Appropriated Value |
2321 |
2515 |
|
|
Adjustments to Appropriated Value |
-81 |
59 |
|
|
FY 1998 Pres Bud Request |
2240 |
2574 |
6201 |
2564 |
Change Summary Explanation: Funding: FY1998/FY1999 increase to support emphasis on Information Operations/Warfare (FY 98 +5261/FY 99 +1267).
C. Other Program Funding Summary: None
D. Schedule Profile |
FY 1996 |
FY 1997 |
FY 1998 |
FY 1999 |
|
1 |
2 |
3 |
4 |
1 |
2 |
3 |
4 |
1 |
2 |
3 |
4 |
1 |
2 |
3 |
4 |
TEED Prototype Model Testing |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TEED Prototype Model Delivery |
X* |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Trusted Network Base contract award |
X* |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Trusted Network Base system review |
X* |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Trusted Network Base software coding |
|
|
|
X* |
|
|
|
|
|
|
|
|
|
|
|
|
Trusted Network Base system integration |
|
|
|
|
|
|
X |
|
|
|
|
|
|
|
|
|
Trusted Network Base delivery |
|
|
|
|
|
|
|
X |
|
|
|
|
|
|
|
|
Re-Programmable COMSEC award |
X* |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Re-Programmable COMSEC card design |
X* |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Re-Programmable COMSEC card test |
X* |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Integration into multiband, multimode
digital radio |
|
|
|
|
|
X |
|
|
|
|
|
|
|
|
|
|
AIRTERM installation kits designed |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
AIRTERM installation kits testing |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
INFOSEC COTS evaluations |
X* |
|
|
|
X |
|
|
X |
X |
|
X |
|
X |
|
|
X |
Secure Gateway Study |
|
|
|
|
|
|
|
|
|
|
|
|
X |
|
|
X |
Acquisition Planning and Procurement |
|
|
|
|
|
|
|
|
|
|
|
|
X |
|
|
X |
Packages for SEGAT, Wireless LAN,NDI |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Evaluation, Installation Support and |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Material Acquisition Contracts |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TACLANE Support |
|
|
|
|
X |
|
|
X |
X |
|
X |
|
X |
|
|
X |
Common Tool Set |
|
|
|
|
|
|
|
|
X |
|
X |
|
X |
|
|
X |
*Denotes completed effort
A. Project Cost Breakdown |
FY 1996 |
FY 1997 |
FY 1998 |
FY 1999 |
Ancillary Hardware and Software Development |
1146 |
1389 |
2862 |
1168 |
System Engineering |
0 |
0 |
1000 |
0 |
Government Engineering Support |
984 |
1075 |
2170 |
1251 |
Travel |
60 |
60 |
100 |
100 |
Miscellaneous |
50 |
50 |
69 |
45 |
SBIR/STTR |
|
|
|
|
Total |
2240 |
2574 |
6201 |
2564 |
B. Budget Acquisition History and Planning Information:
Performing Organizations
Contractor or
Government
Performing
Activity |
Contract
Method/Type
or Funding
Vehicle |
Award or
Obligation
Date |
Performing
Activity
EAC |
Project
Office
EAC |
Total
Prior to
FY 1996
|
FY 1996 |
FY 1997 |
FY 1998 |
FY 1999 |
Budget to
Complete |
Total
Program |
Product Development Organizations |
GTC, Tampa, FL |
C-CPFF |
AUG 91 |
8687 |
8687 |
113435 |
0 |
0 |
0 |
0 |
5500 |
118935 |
GTE, Waltham,
MA |
C-CPFF |
AUG 93 |
3857 |
3857 |
3091 |
0 |
800 |
0 |
0 |
20000 |
23891 |
TBD |
C-CPFF |
JUN 95 |
2050 |
2050 |
966 |
863 |
0 |
1662 |
1168 |
cont'd |
4659 |
Rome Labs |
MIPR |
FEB 95 |
1525 |
1525 |
600 |
587 |
0 |
0 |
0 |
0 |
1187 |
Alliant Tech Sys.,
Eatontown, NJ |
C-CPFF |
OCT 91 |
1100 |
1100 |
1183 |
0 |
0 |
0 |
0 |
cont'd |
1183 |
CECOM, RDEC |
PO |
OCT 95 |
700 |
700 |
0 |
490 |
1274 |
2539 |
1396 |
cont'd |
5699 |
NSA |
MIPR |
MAR 95 |
200 |
200 |
145 |
300 |
500 |
2000 |
0 |
0 |
2945 |
TEXCOM, Tinton
Falls, NJ |
SS-CPFF |
FEB 91 |
900 |
900 |
1200 |
0 |
0 |
0 |
0 |
0 |
1200 |
Totals |
|
|
|
|
|
0 |
0 |
0 |
0 |
|
|
Support and Management Organization: None |
Test and Evaluation Organization: None |
Government Furnished Property: N/A
|
Total
Prior to
FY 1996 |
FY 1996 |
FY 1997 |
FY 1998 |
FY 1999 |
Budget to
Complete |
Total
Program |
Subtotal Product Development |
120620 |
2240 |
2574 |
6201 |
2564 |
25500 |
159699 |
Subtotal Support and Management |
|
|
|
|
|
|
|
Subtotal Test and Evaluation |
|
|
|
|
|
|
|
Total Project |
120620 |
2240 |
2574 |
6201 |
2564 |
25500 |
159699 |
|
COST (In Thousands) |
FY 1996
Actual |
FY 1997
Estimate |
FY 1998
Estimate |
FY 1999
Estimate |
FY 2000
Estimate |
FY 2001
Estimate |
FY 2002
Estimate |
FY 2003
Estimate |
Cost to
Complete |
Total Cost |
D501 |
Army Key Management System (AKMS) |
1215 |
587 |
3446 |
1262 |
1330 |
1325 |
1320 |
1319 |
Continuing |
Continuing |
A. Mission Description and Budget Item Justification: Project D501 - Army Key Management System (AKMS): This program provides decentralized and
automated key generation, distribution and management while enhancing joint interoperability. It eliminates paper encryption key and provides communications network
planning with key management on a single platform.
Acquisition Strategy: AKMS Initial operational test and Evaluation (IOTE) is scheduled August through September FY97 with IOC in February FY98.
FY 1996 Accomplishments:
|
961 |
Workstation software developed |
|
194 |
Provided contractor and programmatic support |
|
60 |
Provided TEXCOM support for IOT&E |
Total |
1215 |
|
FY 1997 Planned Program:
|
567 |
Complete software for the AKMS workstation |
|
20 |
Provide contractor and programmatic support |
Total |
587 |
|
FY 1998 Planned Program:
|
942 |
Provide contractor and programmatic support , and software development upgrades for Common Tier III and AKMS Workstation |
|
2504 |
Develop computer based training for the AKMS Workstation |
Total |
3446 |
|
FY 1999 Planned Program:
|
337 |
Provide contractor and programmatic support , and software development upgrades for Common Tier III and AKMS workstation |
|
925 |
Provide product improvements for Commander in Chief regional controller effort, and future enhancements for new equipment such as ATM COMSEC
devices |
Total |
1262 |
|
B. Project Change Summary |
FY 1996 |
FY 1997 |
FY 1998 |
FY 1999 |
FY 1997 President's Budget |
1273 |
587 |
13669 |
13599 |
Appropriated Value |
1259 |
587 |
|
|
Adjustments to Appropriated Value |
-44 |
|
|
|
FY 1998 Pres Bud Request |
1215 |
587 |
3446 |
1262 |
Change Summary Explanation: Funding: RDT&E funds in FY98 (-9545) and FY99 (-10425) were realigned to the OPA line BA1201.
C. Other Program Funding Summary |
FY 1996 |
FY 1997 |
FY 1998 |
FY 1999 |
FY 2000 |
FY 2001 |
FY 2002 |
FY 2003 |
To Comp |
Total Cost |
OPA Z16800 |
13705 |
13556 |
0 |
0 |
0 |
0 |
0 |
0 |
cont'd |
cont'd |
OPA TA0600 |
10758 |
10678 |
9976 |
12038 |
14418 |
16366 |
18914 |
18325 |
cont'd |
cont'd |
OPA BS9716 |
550 |
828 |
551 |
359 |
894 |
887 |
1424 |
1744 |
cont'd |
cont'd |
OPA BA1201 |
0 |
0 |
4745 |
10425 |
1938 |
1737 |
2691 |
3531 |
cont'd |
cont'd |
D. Schedule Profile |
FY 1996 |
FY 1997 |
FY 1998 |
FY 1999 |
|
1 |
2 |
3 |
4 |
1 |
2 |
3 |
4 |
1 |
2 |
3 |
4 |
1 |
2 |
3 |
4 |
AKMS Decision Brief |
|
X* |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
AKMS Award Competitive Follow-on
Contract |
|
|
X* |
|
|
|
|
|
|
|
|
|
|
|
|
|
AKMS Computer Software Configuration
Item Testing |
|
|
|
|
|
|
X |
|
|
|
|
|
|
|
|
|
AKMS Initial Operational Test &
Evaluation |
|
|
|
|
|
|
|
X |
|
|
|
|
|
|
|
|
AKMS Milestone III |
|
|
|
|
|
|
|
|
X |
|
|
|
|
|
|
|
AKMS Type Classification |
|
|
|
|
|
|
|
|
X |
|
|
|
|
|
|
|
AKMS Material Release |
|
|
|
|
|
|
|
|
X |
|
|
|
|
|
|
|
AKMS Begin Fielding with Upgraded
Software |
|
|
|
|
|
|
|
|
|
X |
|
|
|
|
|
|
AKMS Initial Operational Capability |
|
|
|
|
|
|
|
|
|
X |
|
|
|
|
|
|
AKMS Material Release CT3 Upgrade |
|
|
|
|
|
|
|
|
|
|
|
|
X |
|
|
|
AKMS Material Release Work Station
Upgrade |
|
|
|
|
|
|
|
|
|
|
|
|
X |
|
|
|
*Milestone completed
A. Project Cost Breakdown |
FY 1996 |
FY 1997 |
FY 1998 |
FY 1999 |
Software Engineering (Contractor) |
961 |
575 |
946 |
305 |
Government Engineering Support |
220 |
10 |
2400 |
907 |
Program Management Support |
12 |
2 |
100 |
50 |
Congressional Adjustments |
22 |
0 |
|
|
SBIR/STTR |
|
|
|
|
Total |
1215 |
587 |
3446 |
1262 |
B. Budget Acquisition History and Planning Information: Not Applicable